One of the main directions of the company is the construction of cottage settlements of various types. All projects are carried out at a highly professional level and meet all the requirements of the European standard. Thanks to our technology, the complexes are built in the shortest possible time, thereby reducing the return on investment, houses arrive at the building site already ready-made and are assembled into a house ready for operation in 2 months. Our company will also design and implement the entire infrastructure of the village: playgrounds, restaurants, sports and bath complexes, house territory, access roads. We also design, manufacture and assemble furniture for each building.
Our houses are mobile and can be installed
anywhere in the world
Prefabricated houses
Factory assembly
The first stage in construction is the assembly of the house kit. We deliver the house kit to the place where the house is being built, we install walls and roofs, install doors and windows, and install a storm system. After this stage, the house is completely ready for interior decoration.
Next, we proceed to the installation of engineering networks: water supply, sewerage, electricity, heating and video surveillance. We carry out interior wall painting, installation of the finishing ceiling, laying tiles, installing interior doors, installing sockets and switches.
Our company completes the object with furniture. We will develop the interior design of your home, select materials and fittings, produce high-quality furniture and deliver it together with the house kit. Let’s install furniture, we will mount the sanitary equipment.
Photos of our objects
Implemented complex objects
Main stages of construction
individual house
Get a specialist consultation
The houses are completely made in our production, which guarantees the impeccable quality of materials,
painting and durability of all modules